• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于LCC和改进BDE法的配电网开关优化配置
Optimal Switching Configuration of Distribution System Based on LCC and Improved BDE
Received:June 07, 2014  Revised:April 01, 2015
DOI:
中文关键词: 配电网  开关优化  全寿命周期成本  差分进化算法
英文关键词: distribution  system,optimal  switching,LCC,DE
基金项目:
Author NameAffiliationE-mail
YU Teng-kai* Hebei Electric Power Research Institute,Hebei Shijiazhuang 050021 xyydream@126.com 
LI Xiao-jun Hebei Electric Power Research Institute,Hebei Shijiazhuang 050021  
Hits: 1801
Download times: 562
中文摘要:
      针对配电网开关配置问题,基于全寿命周期成本建立优化配置模型,考虑配置方案一次性投入成本、运行维护成本、停电损失成本、退役处置成本,寻求满足多约束条件下的经济性最优。提出一种改进二进制差分算法(IBDE)对上述模型进行求解,采用多阈值的进化策略,并基于云理论优化交叉操作,获得大量具有稳定倾向性和随机性的个体交叉因子。将模型及算法应用于IEEE-RBTS系统,结果表明,该模型更符合实际情况,该算法以略低的收敛速度大幅提高了标准BDE算法的全局搜索概率,其收敛速度仍要快于GA算法。
英文摘要:
      The paper establishes switching optimal model of distribution system based on LCC. To seek optimal economy under multi-constrained conditions, it contains original investment cost, operation and maintenance cost, outage loss cost and disposal cost. An improved BDE is put up to solve the above model. It uses normal cloud generator to optimize individual cross factor which has stability and randomness. The model and algorithm are applied to IEEE-RBTS system; the result proves that the model meets the actual circs better, and IBDE greatly improves global search probability with slightly low convergence speed, but has faster speed than GA algorithm.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd