• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于启发式算法的电力系统综合负荷模型的自动选择
Automatic selection of power system aggregate load model based on heuristic algorithm
Received:July 01, 2014  Revised:July 01, 2014
DOI:
中文关键词: 电力系统  综合负荷模型  负荷模型组合  自动选择  启发式算法
英文关键词: power system, aggregate load model, load model combination, automatic selection, heuristic algorithm
基金项目:
Author NameAffiliationE-mail
ZHANG Jian Department of Electrical Engineering,Zhengzhou University zhangjian63@zzu.edu.cn 
WANG Fei* Department of Electrical Engineering,Zhengzhou University 792528523@qq.com 
ZhaoBing The Patent Office Patent Review Collaboration Center in Henan, the State Intellectual Property Office  
Hits: 1605
Download times: 849
中文摘要:
      针对电力系统中负荷种类多种多样,系统综合负荷模型的组合方案不可能一一列出的问题,本文提出了一种通过建立负荷模型库,并且利用表示负荷模型投入情况的0-1逻辑变量为决策变量,以表示等值负荷模型组合的拟合响应与实际响应接近程度的拟合误差最小为目标函数的最优负荷模型自动选择的方法。通过对实际电网动态等值模型的自动选择,得到所选模型组合能够较好的描述负荷行为,表明电力系统综合负荷模型自动选择这一方法的可行性和有效性。
英文摘要:
      The types of load model in power system are various, thus the combinations of power system aggregate load model can not be completely listed. In view of the above problems, through the establishment of load model library, a automatic selection method of the optimal load model is put forward in this paper, which regards the minimum fitting error that represents the proximity of fitting response and practical response as objective function, and put the 0-1 logic variables that represents the investment situation of load model as decision variable. The effectiveness and feasibility of the proposed method is verified by the automatic selection of the actual power grid dynamic equivalent model, and the selected model combination can describe the load behavior well.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd