• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
高压大截面电缆固定金具损耗探讨
The Research of High Voltage Large Cross-section Support Clamp’s Eddy-current Loss
Received:July 03, 2014  Revised:July 03, 2014
DOI:
中文关键词: 大截面  电力电缆  固定金具  损耗
英文关键词: large cross-section, cable, support clamp, eddy-current loss.
基金项目:
Author NameAffiliationE-mail
YOU Shi-liang Sichuan Electric Power Design Consulting Co., Ltd.  
WU Hao Sichuan Electric Power Design Consulting Co., Ltd.  
LI Jian* School of Electrical Engineering and Information,Sichuan University 623141161@qq.com 
liunian sichuan university  
WANG Li-lai Electrical and Information College of Sichuan University  
YANG Kai-qiang Electrical and Information College of Sichuan University  
Hits: 1867
Download times: 825
中文摘要:
      随着城市建设的逐步深入,城市规模的扩大,相应的城市用电负荷也在增加。原有的城市架空输电线路以及电缆已经不能满足城市用电量的需求,由于城市地面的拥挤加之电力电缆可以通过地下以及隧道敷设等优点,高压大截面输电电缆的敷设距离越来越长,大截面电缆固定金具应用越来越广。本文着重通过对高压大截面电缆固定金具损耗进行研究,在载流量一定的情况下,建立固定金具的数学计算模型,并通过SOLIDWORKS和COMSOL软件进行仿真,最终得到固定金具的材质对损耗的影响。
英文摘要:
      With the acceleration development of cities construction and the expansion of cities. Cities’ power load is increasing. The original cities’ overhead transmission line and cable has can’t meet the needs of city electricity consumption, Because the cable can through the tunnels and underground installation, high voltage large cross-section transmission cable install more and more long, support clamp is applied more and more widely. In this paper, we study the loss of high voltage large cross-section transmission cable support clamp, in the case of current carrying capacity remains the same, set up the support clamp’s math model, through the simulation of SOLIDWORKS and COMSOL, finally, we get the different material’s loss.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd