• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
优质电力园区多DFACTS设备协调控制策略
Coordinated Control Strategy of multiple DFACTS in Premium power park
Received:August 30, 2014  Revised:August 30, 2014
DOI:
中文关键词: 优质电力园区  协调控制  DFACTS  电能质量监控中心
英文关键词: premium power park  coordinated control  DFACTS  power quality monitoring and controlling centre (PQMCC)
基金项目:
Author NameAffiliationE-mail
LIANG Ying-Yu* State Key Laboratory for Alternate Electrical Power System with Renewable Energy Sources North China Electric Power University,Changping District liangyingyu2013@163.com 
LIU Jian-Zheng State Key Lab of Control and Simulation of Power Systems and Generation Equipments Tsinghua University,Haidian District  
XU Xing-Tao Jiangsu Electric Power Company Research Institute,Jiangning District,Nanjing  
Wang Yi State Key Lab of Control and Simulation of Power Systems and Generation Equipments Tsinghua University,Haidian District  
YANG Qi-Xun State Key Laboratory for Alternate Electrical Power System with Renewable Energy Sources North China Electric Power University,Changping District  
Hits: 1768
Download times: 568
中文摘要:
      优质电力园区利用多种DFACTS设备为园区内不同等级的负荷提供相应等级的电能,是一种解决电能质量问题的重要手段。由于多种DFACTS设备可能同时动作,需要对它们进行协调控制。本文依托南京青奥会优质电力园区配套工程,提出基于电能质量监控中心的多DFACTS设备协调控制策略,PSCAD/EMTDC的仿真结果验证了该方法的正确性和有效性。#$NL关键词:优质电力园区;协调控制;DFACTS;电能质量监控中心
英文摘要:
      Premium power park provides corresponding power supply for different levels of load using multiple DFACTS, which is an important means to solve power quality problem. Multiple DFACTS may operate simultaneously, so they need be coordinated. Depending on Nanjing Youth Olympic Games Premium Power Park engineering, coordinatd control strategy of multiple DFACTS based on power quality monitoring and controlling centre is presented in this paper and simulation results in PSCAD/EMTDC verify its validity and effectiveness.#$NLKeywords: premium power park; coordinated control; DFACTS; power quality monitoring and controlling centre (PQMCC)
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd