• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
低压电流互感器自动化检定系统相关问题探讨
Discussion on Relevant Issues for Automatic Testing Systemof 0.4kV Current Transformer
Received:February 25, 2015  Revised:February 26, 2015
DOI:
中文关键词: 电流互感器  自动化检定系统  溯源  负荷下限  多路输出一致性  测量过程控制
英文关键词: current  transformer, automatic  testing system, trace  to the  source, low  limitation for  capacity, multiple  output consistency, measurement  process control
基金项目:
Author NameAffiliationE-mail
DING Tao* Henan Electric Power Research Institute Dingtao_cn@163.com 
LIU Zhong Henan Electric Power Research Institute  
YANG Nai-gui Henan Electric Power Research Institute  
ZHANG Wei Henan Electric Power Research Institute  
Hits: 1609
Download times: 696
中文摘要:
      简要介绍了低压电流互感器自动化检定系统的技术与应用,对系统存在相关问题进行了探讨研究。对电流互感器磁饱和误差、二次绕组匝间绝缘测量无法溯源的问题提出了溯源的思路。对二次负荷下限容量不合理进行了分析,建议下限容量设置为1VA,并在现场加强二次负荷的测试。测量了系统的重复性、多路输出一致性,指出其指标差是互感器二次回路继电器接点接触电阻和二次端子压接不良是造成的。对系统的重复性、稳定性考核,建议采用休哈特图开展测量过程控制。最后对实验室的温湿度控制进行了探讨,指出了建议。
英文摘要:
      This paper introduces briefly technology and application of Automatic Testing System of 0.4kV Current Transformer and some relevant issues of the system are discussed. Some ideas of trace to the source are provided for the current transformer test of magnetic saturation error and secondary winding inter-turn insulation. The upper volume is disproportionate to the secondary load and suggestion is proposed that The upper volume is set to 1VA. Secondary load is required to strengthen measure. The repeatability and multiple output consistency of this system are measured and find that the main reason is the existence of contact resistance of relays and poor contact on two terminals of current transformer. Measurement process control is acted on the repeatability and stability of the system according to the Shewhart control chart. Finally, it discusses the lab control of temperature and relative humidity and gives the advice.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd