• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
提高变电站基础量测数据时间同步性的方法
Methods for Improving Time Synchronism of Substation Basic Measurement Data
Received:February 28, 2015  Revised:February 28, 2015
DOI:
中文关键词: 变电站  量测数据  时间同步性  母线不平衡  带时标上送  RTDS
英文关键词: Substation, Measurement  Data, Time  Synchronization, Bus  Power Imbalance, Send  Data with  Timestamp, RTDS.
基金项目:国家自然科学基金资助项目(61233007); 2014年国网总部科技项目;电子信息产业发展基金资助项目财建[2013]757号
Author NameAffiliationE-mail
Shen Jian* NARI Technology Development CO.Ltd. shenjian@sgepri.sgcc.com.cn 
Zhang Min NARI Technology Development CO.Ltd.  
Zhou Bin NARI Technology Development CO.Ltd.  
Hou Mingguo NARI Technology Development CO.Ltd.  
Tan Yong NARI Technology Development CO.Ltd.  
Peng Qi NARI Technology Development CO.Ltd.  
Hits: 1787
Download times: 605
中文摘要:
      为了减小变电站端量测数据不同步引起主站状态估计等应用的误差,研究了提高变电站量测数据时间同步性的方法。结合部分500kV高压变电站出现的站内母线功率不平衡现象,分析了变电站基础量测数据时间同步性的主要影响因素,提出若干提高同步性的方法。方法采用基于离散傅里叶变换(DFT)的快速量测算法,量测数据带时标上送,同时设置合理的变化死区提高量测刷新速率,远动装置根据量测时标对齐同一断面数据组包上送。采用RTDS动模仿真试验系统搭建测试环境进行对比试验,试验结果验证了方法的有效性。
英文摘要:
      In order to reduce the master station state estimation error caused by asynchronous substation measuring data .Methods for improving time synchronism of substation measuring data are researched. According to the bus power imbalance phenomenon of some 500kV UHV substation, the main factors which affected time synchronization of substation basic measuring data are analyzed. Several methods to improve the synchronization of the basic measuring data in substation are proposed. The methods are based on fast measuring algorithm, send the measuring data with time stamp, and set suitable changing threshold to improve the refresh rate of measuring data. The retransmission unit aligned measuring data according to the time stamp and send it to master station in one packet. A simulation test system is built by using RTDS and several kinds of comparative test are done. The test result proves that the methods are effective.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd