• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于HFCT局放测试技术的高压电缆终端失效检测方法研究
Research of high voltage cable terminal failure detection methodbased on HFCT test technology of partial discharge
Received:June 09, 2015  Revised:June 09, 2015
DOI:
中文关键词: 交流变频谐振耐压  局部放电  电缆终端  终端失效
英文关键词: AC  variable frequency  resonant pressure, partial  discharge, cable  terminal, terminal  failure
基金项目:
Author NameAffiliationE-mail
HAN Yu-Ze* Nanjing Power Supply Company jensenhyz@163.com 
GUO Xiang-Qi Nanjing Power Supply Company  
CHU Qiang Nanjing Power Supply Company  
Hits: 1475
Download times: 536
中文摘要:
      本文针对高压电缆终端因缺陷造成的运行失效问题,分析局部放电的机理,采用HFCT(高频电流传感器)的局放测试技术并结合交流变频谐振耐压的试验方式,设计了一种通过监测电缆终端在不同试验电压下的局部放电图谱,以确定电缆终端发生失效状态的检测方法。通过现场化的试验验证,有效地发现了高压电缆终端缺陷。应用该检测方法,解决了高压电缆工程竣工验收问题,可以在电缆终端竣工验收中有效地发现微小缺陷,对于提前判断高压电缆终端失效具有明显效果。可避免因终端失效造成的电缆运行故障甚至是终端头爆炸等事故。
英文摘要:
      In this paper, In view of the high voltage cable terminal operation failure caused by defects, Analysis the mechanism of partial discharge, Using HFCT (high frequency current sensor) partial discharge test technology and the combination of AC variable frequency resonant pressure test, Design a method to determine cable termination happen failure state detect by monitoring partial discharge pattern of cable termination under different test voltage. Through the field test, found the high voltage cable terminal defect effectively. Application of the test methods, solve the problem of high voltage cable project completion acceptance, can be effectively found in cable terminal completion inspection and acceptance imperfections, have obvious effect for judging high voltage cable terminal failure in advance. Can avoid the failure caused by cable terminal malfunction even terminal head explosion accidents.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd