• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于模式切换的直驱式风力发电机最大功率跟踪控制
MPPT control of Direct-driven Wind Turbine Generators based on mode switch
Received:September 13, 2015  Revised:October 04, 2015
DOI:
中文关键词: MPPT  直驱  永磁同步风力发电机  模式切换  LS-SVM
英文关键词: MPPT, Direct  Drive, PMSG, Mode  Switch, LS-SVM
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)
Author NameAffiliationE-mail
Wai Lijiang Zi Bibula* College of Electrical Engineering,Xinjiang University kaplan0136@126.com 
Li Yongdong Department of electrical engineering and application of electronic technology, Tsinghua University liyd@mail.tsinghua.edu.cn 
Cheng ZhiJiang College of Electrical Engineering,Xinjiang University 1186230043@qq.com 
Hits: 2025
Download times: 474
中文摘要:
      变步长爬山搜索法具有算法简单,跟踪精度高的特点,但在搜索阶段风速有较大变化时有跟踪失误的缺点。最优叶尖速比法风速快速波动时,能够快速跟踪,鲁棒性强,但风速不易测量,存在测量误差。针对上述问题,提出将基于LS-SVM风速估计的最优叶尖速比法和变步长爬山搜索法相结合构建一种模式切换的最大功率跟踪方法。仿真结果证明此方法的有效性和可行性。
英文摘要:
      Variable step climbing search method is proven to be Conciseness, and high tracking efficiency, but during search phase, there are disadvantages of tracking errors in case of rapid changes in wind speed. Optimum tip speed ratio method can quickly track on and has strong robustness when wind speed changes rapidity, but Winds difficult to measure, and the measurement has error。Address the above issue, the maximum power point tracking control method is presented based on mode switching which combined optimal tip speed ratio method based on LS-SVM wind speed estimate with Variable step climbing search method. The simulation results show the effectiveness and feasibility of this method.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd