• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于抗扰时间的优质电力园区技术方案优化方法
Optimization Method of Technical Solutions in Premium Power Park Based on Process Immunity Time
Received:October 23, 2015  Revised:December 01, 2015
DOI:
中文关键词: 优质电力园区  工业过程  抗扰度  过程抗扰时间  可接受后果状态  技术方案  优化模型
英文关键词: Premium Power Park  industrial process  sag immunity  immunity time  acceptable consequence status  technical solution  optimization model
基金项目:
Author NameAffiliationE-mail
yuguangming* State Grid Tongliang County Power Supply Company 1194636407@qq.com 
zhengying State Grid Tongliang County Power Supply Company) zhengyingcq@qq.com 
Hits: 2057
Download times: 646
中文摘要:
      优质电力园区是有效解决区域性高品质供电问题的技术方案,其技术方案优化是进行园区建设的前提。为满足不同用户的不同供电质量需求,引入过程暂降抗扰时间和抗扰度概念,考虑园区内各工业过程的电压暂降响应特性、物理参数及其变化规律,以及用户可接受后果状态,提出基于过程抗扰时间的用户供电质量需求与园区供电质量等级划分方法,以用户需求为约束,总投资最少为目标,建立优化模型,并研究了优化模型的Tabu搜索算法。对典型园区的仿真结果表明,本文方法正确、可靠,能在满足用户不同供电质量需求的同时,保证总投资最少,为优质电力园区的建设提供了保证。
英文摘要:
      Premium Power Park (PPP) is a technical solution to solve the regional high-quality power supply problems. The technical optimization method is the premise of planning and constructing. To meet various power requirements of different customers, the concept of process immunity time and sag immunity is lead up in this paper. Considering the response characteristic of process to sag, physical parameters and their variation, and acceptable resulting status of customer, the methods of quantification for customers’ demands and classification for power quality level are proposed. On this basis, optimization model is established by constraints of customers’ requirement and taking the minimum cost as the objective. And its corresponding algorithm based on Tabu search method is researched. The proposed method is applied to a typical PPP and it is proved to be accurate and valid. The results show that this method can meet each customer’s demand, meanwhile, ensure the minimum of total investment. And it provides a guarantee for engineering construction of PPP.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd