• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
智能化变电站二次侧电能计量系统计量误差分析及现场检测方法
Analysis of Metering Error and Methods for On-Site Testing of Secondary Energy Metering System in Smart Substation
Received:August 29, 2016  Revised:October 27, 2016
DOI:
中文关键词: 模拟量输入式合并单元  二次侧电能计量系统  计量误差分析  现场检测方法
英文关键词: analog-input MU, secondary energy metering system, analysis of metering error, methods for on-site testing
基金项目:基于多点采样技术的智能化变电站综合现场检测系统研制与应用
Author NameAffiliationE-mail
Pei Maolin* State Grid Jiangxi Electric Power Research Institute 29589219@qq.com 
Liu Qiang State Grid Jiangxi Electric Power Company liuqiang@jx.sgcc.com.cn 
Huang Yangjie State Grid Jiangxi Electric Power Company 809351543@qq.com 
Yan Qin State Grid Jiangxi Electric Power Company yanqin@jx.sgcc.com.cn 
Xie Sanjun State Grid Jiangxi Electric Power Research Institute 258380097@qq.com 
陈琛 State Grid Jiangxi Electric Power Research Institute 1148197789@qq.com 
Hits: 1666
Download times: 970
中文摘要:
      针对智能化变电站模拟量输入式合并单元的电能计量系统误差超差问题,构建了智能化变电站二次侧电能计量模拟系统及其检测平台。在电压合并单元、电流合并单元、数字化电能表均满足检测规范要求的前提下,分析可能造成电能计量误差的因素,开展电能计量误差的影响测试,最终确定了影响电能计量误差的关键因素及其影响程度,并提出了智能化变电站二次侧电能计量系统现场测试检测平台,从而解决其计量误差超差问题。#$NL关键词: 模拟量输入式合并单元; 二次侧电能计量系统; 计量误差分析; 现场检测方法
英文摘要:
      For the structure of the secondary energy metering system, which is based on the analog-input MU in smart substation, a simulation system for the secondary energy metering in smart substation is builded, as well as its direction platform. Various factors which may cause the energy metering error are analyzed under the premise that the voltage MU, current MU (MU) and digitized electric energy meters meet the requirements of technical code. Then the key factors which cause the energy metering error and the influence level of other factors are identified after the impact test of the energy metering error. What"s more, the direction platform of on-site testing of secondary energy metering system in smart substation is proposed. As a result, the oversize of metering error is solved. #$NLKeywords: analog-input MU, secondary energy metering system, analysis of metering error, methods for on-site testing
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd