• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
特高压双直流送端电网直流闭锁故障稳控措施研究
Research of stability control strategies for UHV Double DC sending grid occur DC blocking fault
Received:August 05, 2017  Revised:September 19, 2017
DOI:
中文关键词: ±1100kV直流  双直流  直流闭锁  直流紧急功率支援  稳控措施
英文关键词: ±1100kV DC UHV Double DC  DC blocking  Emergency DC power supply  Stability control strategies
基金项目:国家自然科学(51467019)
Author NameAffiliationE-mail
LIU Hongzheng School of Electrical Engineering,Xinjiang Urumqi 1534135170@qq.com 
FAN Yanfang* School of Electrical Engineering,Xinjiang Urumqi 534935839@qq.com 
Hits: 1408
Download times: 556
中文摘要:
      基于新疆电网2017年规划网架结构,±1100kV准东直流将作为第二条直流外送通道接入新疆送端电网。为了保障新疆送端电网的安全稳定运行,当±800kV哈郑直流发生闭锁故障时,提出综合考虑±1100kV直流紧急功率支援、送端电网切机的稳控手段,分析两种不同稳控措施对于含双直流送端电网运行电压的影响。研究结果表明在满足新疆电网稳定运行前提下,稳控切机配合直流紧急功率支援能有效降低送端电网的切机量,平衡直流故障后的无功功率。该稳控措施对提高双直流送端电网的电压稳定及优化送端电网稳控切机不平衡量具有一定的参考价值。
英文摘要:
      Based on the Xinjiang Power Grid Planning grid structure in 2017, Zhundong-Chongqing ± 1100kV HVDC will serve as the second delivery channel DC second access to the Xinjiang sending-end grid. In order to guarantying the security and stability of the Xinjiang sending-end grid, When Hazheng ± 800kV DC blocking fault, put forward considering the ± 1100kV emergency DC power supply, the sending-end grid of thermal power , analysis of different stability control measures of influence for containing double DC voltage of the sending-end grid. The paper results illustrate that under the premise of stable operation of Xinjiang sending-end grid, the steady control and DC power supply can effectively reduce the power cut of the power supply network, and balance the reactive power after DC fault. The stability control measures have certain reference value to improve the voltage stability of the Double DC sending-end grid and to optimize the control of the unbalance cutting power.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd