• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
大容量直流融冰兼网省协调无功补偿装置的集成与应用
The integration and application of large capacity DC ice melting and static var compensation device with network provincial coordination
Received:September 21, 2017  Revised:September 21, 2017
DOI:
中文关键词: 大容量  直流融冰  静止无功补偿  500kV变电站  AVC
英文关键词: large  capacity, DC  ice melting, Static  Var Compensation, 500kV  station, AVC
基金项目:
Author NameAffiliationE-mail
Chen Zhong* State Grid Anhui Electric Power Research Institute chenzh06@163.com 
Ji Kun State Grid Anhui Electric Power Company 12345678@126.com 
Luo Sha State Grid Anhui Electric Power Company luosha616@163.com 
Zhang Junjie State Grid Anhui Maintenance Company 57277088@qq.com 
Cheng Dengfeng State Grid Anhui Electric Power Research Institute chengdf2000@yahoo.com.cn 
Cao Songyuan State Grid Anhui Electric Power Company caosy1114@163.com 
Hits: 1903
Download times: 571
中文摘要:
      500kV官山变固定式直流融冰兼无功补偿装置主电路为无换流变的6脉波桥式拓扑,网侧电抗器采用油浸式铁心结构,兼作无功补偿模式下的相控电抗器。该装置在无功补偿模式下直接接入华东网调电压自动控制系统,接受无功指令调度运行。本文介绍了该套装置的基本参数、拓扑重构方案、融冰线路切换系统、无功网省协调机制。给出了典型运行模式下的控制策略,并且结合现场运行数据对该套装置在架空输电线路融冰、无功补偿方面的应用效果进行了分析。
英文摘要:
      The main circuit topology of fixed DC ice melting and reactive power compensation device in 500kV Guanshan station is a 6-pulse bridge without converter transformer. The type of grid-side reactor is oil-filled iron core, also serves as phase controlled reactor in reactive power compensation mode. The device is direct accessed by the automatic voltage control system of East China Grid company, accepts scheduled command during reactive power compensation mode. The basic parameters, topology reconstruction scheme, ice melting line switching system, reactive coordination mechanism between East China Grid company and provincial grid company is introduced in this paper. The control scheme in typical operating mode is also described, and combined with field operating data, the effect of the device in overhead power transmission lines ice melting and reactive power compensation are analyzed.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd