• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
模拟量输入合并单元时间性能参数测试系统研究
Research on Testing System for Time Performance Parameters of Analog-input Merging Unit
Received:November 30, 2017  Revised:November 30, 2017
DOI:
中文关键词: 模拟量输入合并单元  时间性能参数  测试系统  三分之一准则
英文关键词: Analog-input merging unit, time performance parameters, testing system, one third rule
基金项目:国家重点研发计划(2016YFF0102400)
Author NameAffiliationE-mail
Tang Dengping Measurement Center,State Grid Hubei Electric Power Company tangdp@hb.sgcc.com.cn 
Zheng Xin Measurement Center,State Grid Hubei Electric Power Company shzhengxin@163.com 
Li Jun Measurement Center,State Grid Hubei Electric Power Company 13995619333@163.com 
Lei Ming Measurement Center,State Grid Hubei Electric Power Company hbeptriyf@126.com 
Gong Junyan* Huazhong University of Science and Technology 774911800@qq.com 
Li Hongbin Huazhong University of Science and Technology lihongbin@hust.edu.cn 
Hits: 1828
Download times: 1233
中文摘要:
      模拟量输入合并单元是智能变电站中广泛应用的设备,其时间性能是否满足规范要求直接关系到采样数据的同步性,对变电站计量与保护装置正常运行产生影响。目前较少有针对时间性能进行的研究及较为全面的时间性能测试系统。文章根据模拟量输入合并单元检验规范中时间性能的技术要求,分析了时间性能参数的含义及误差来源,提出针对模拟量输入合并单元不同时间性能参数、不同同步方式的测试方法,研制了时间性能参数测试系统,并对测试系统进行了TDC测时、相差测量准确度验证,及测试系统报文解析功能验证。结果表明,系统符合“三分之一准则”下的误差要求,满足时间性能检验需求。
英文摘要:
      As analog-input merging unit is widely used in intelligent substation, its time performance whether meets the requirements of testing specification is directly related to the synchronization of sampling data, thus may affect the operation of measurement and protection devices in intelligent substation. Nowadays there are few studies on time performance of analog-input merging unit and few relatively comprehensive testing system. This paper analyzes the meaning of time performance parameters and its error sources according to the requirements for time performance of analog-input merging unit in testing specification, proposes some test methods aiming for different time parameters and different synchronization mode, develops a testing system for time performance parameters. Paper also verifies the accuracy of time measurement based on TDC, the accuracy of phase-difference measurement and the function of SV message analysis. Results show that testing system is in line with the requirement of “one third rule” and meets the demand of time performance testing.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd