• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于模糊综合评价法的智能变电站二次设备状态评价研究
Study on state evaluation of two equipment in intelligent substation based on fuzzy comprehensive evaluation method
Received:December 29, 2017  Revised:December 29, 2017
DOI:
中文关键词: 智能变电站  二次设备  模糊综合评价法
英文关键词: Smart  Substation, Secondary  equipment, Fuzzy  comprehensive evaluation  method
基金项目:国家电网公司科技项目(524625160028)
Author NameAffiliationE-mail
Wu Junjie* Wuhan NARI limited liability company of State Grid Electric Power Research Institute 877424770@qq.com 
Chen Cheng Wuhan NARI limited liability company of State Grid Electric Power Research Institute WZL612710@126.com 
Cheng Lin Wuhan NARI limited liability company of State Grid Electric Power Research Institute 569715261@qq.com 
Jiang Yi Wuhan NARI limited liability company of State Grid Electric Power Research Institute 1579743972@qq.com 
Han Qin State Grid Wuhan Power Supply Company 2117049815@qq.com 
Feng Liang CYG SUNRI CO.,LTD 326915839@qq.com 
Hits: 1651
Download times: 553
中文摘要:
      针对智能变电站二次设备缺乏全面有效的状态检测以及简单可靠的评判方法,列举了影响智能变电站二次设备状态准确评判的一些因素,并对常用评估法各自的重要特点进行比较,得出对于智能变电站二次设备,模糊综合评价法更加能够准确的进行状态评判。文中给出了使用模糊综合评价法进行智能变电站二次设备状态评价的具体的计算步骤,并通过例子对该方法的有效性和可靠性进行了验证。
英文摘要:
      In view of the lack of comprehensive and effective performance testing and simple and reliable evaluation methods for the two equipments in the smart substation, this paper lists some factors that affect the accurate evaluation of the two equipment performance in the Smart Substation, and compares the important characteristics of commonly used assessment methods, it is concluded that the fuzzy comprehensive evaluation method is more accurate for the secondary equipment of intelligent substation.The calculation steps are given, and the effectiveness and reliability of the method are verified by an example.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd