• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
可再生能源和特高压接入的输电系统规划研究
Comprehensive assessment of transmission network planning schemes considering renewable energy and UHV integration
Received:May 04, 2018  Revised:May 04, 2018
DOI:
中文关键词: 关 键 词:可再生能源  特高压  多利益主体  输电网规划  评估
英文关键词: renewable energy  UHV  multi-participants  transmission network planning  assessment
基金项目:国家自然科学基金项目(51307104)
Author NameAffiliationE-mail
LU Yu-hua* School of Electric Power Engineering,Shanghai University of Electric Power 773963700@qq.com 
ZOU Llong State Grid Fuyang Power Supply Company zoulong6666@163.com 
HUAN Bao-hong State Grid Fuyang Power Supply Company 1437663585@qq.com 
XU Yun-feng State Grid Fuyang Power Supply Company 1490854973@qq.com 
WANG Yun-bin State Grid Fuyang Power Supply Company 1098433473@qq.com 
WANG Hua-xin School of Electric Power Engineering,Shanghai University of Electric Power 13255830916@163.com 
Hits: 1284
Download times: 854
中文摘要:
      首先从经济性、可靠性、潮流、负荷、环境角度分析了可再生能源接入对规划的影响,从短路电流的角度分析了特高压接入对规划的影响,然后根据不同利益主体的侧重点不同,建立了考虑电网企业、政府、终端用户三个多利益主体的输电网规划方案评估指标体系,包括全寿命周期成本、风电场容量可信度等合计6种实用指标,采用模糊综合评估方法进行综合评估,最后通过某实际区域的输电网规划方案比选算例验证了方法的有效性并给出了比选结果。
英文摘要:
      Firstly, the impacts of renewable energy integration on transmission network planning from the perspectives of economy, reliability, power flow, load and environment, and the impacts of UHV integration on transmission network planning considering short-circuit are deeply analyzed. Then, according to different emphases of different participants, the assessment indicators of transmission network planning considering power grid enterprises, government and users are established, including life cycle cost index, wind power capacity credit index and so on. The fuzzy comprehensive evaluation method is adopted. Finally, a practical transmission network planning comparison case is carried out, which verifies the effectiveness of the proposed method in this paper and the results are given.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd