• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于SCD配置文件的高度可视化工具研究
Research on highly visualized tool based on SCD configuration file
Received:August 01, 2018  Revised:August 01, 2018
DOI:
中文关键词: 智能变电站  二次回路  SCD配置文件  高度可视化
英文关键词: smart substation  secondary circuit  SCD configuration file  high-level visual
基金项目:
Author NameAffiliationE-mail
ZHAO Xiaodong Su Zhou Power Supply Company of Anhui Electric Power Company of State Grid 272155398@qq.com 
LI Feng* Su Zhou Power Supply Company of Anhui Electric Power Company of State Grid 178358148@qq.com 
FU Leilei Su Zhou Power Supply Company of Anhui Electric Power Company of State Grid 945050368@qq.com 
Hits: 2262
Download times: 804
中文摘要:
      常规变电站以电缆的形式来完成保护装置之间的信号传递,随着智能变电站的兴起,传统的电缆信号传递方式逐渐被以二次虚回路及光纤回路相结合的方式所代替。这种信号传递方式的转变使得变电站的二次回路不再那么透明,现场技术人员无法通过对直观二次回路的分析来完成现场工作,智能变电站SCD(Substation Configuration Description)配置文件高度可视化工具的缺乏严重影响着继电保护安全措施的实施。本文提出将难以解析的SCD配置文件以高度可视化的方式展示出其配置信息,并将虚端子配置信息与光纤回路相结合,形象的展示虚端子配置信息在光纤回路中的“流通”过程,方便现场工作人员的查阅和解读,减少其产生错误的概率。
英文摘要:
      Conventional substation complete signal transmission between protective devices in the form of cable, with the rise of smart substation, the traditional mode of cable signal transmission is gradually replaced by the secondary virtual circuit and fiber circuit. The transformation of the signal transfer mode makes the secondary circuit of the substation no longer so transparent, and the on-site technicians can not perform the on-site work by analyzing the visual secondary circuit, the lack of high-level visual tool for SCD (Substation Configuration Description) configuration file in smart substations seriously affect the implementation of relay protection safety measures. This paper presents an unresolved SCD configuration file to display its configuration information in a highly visualized way, and combines the virtual terminal configuration information with the fiber circuit to display the "Circulation" process of the virtual terminal configuration information in the fiber circuit, which facilitate the inspection and interpretation of the on-site staff and reduce the probability of producing errors.#$NLKeywords: smart substation; secondary circuit; SCD configuration file; high-level visual
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd