• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
海上升压站大孤岛运行模式技术研究
Research on Big Island Operation Technology of Offshore Substation
Received:August 15, 2018  Revised:August 15, 2018
DOI:10.19753/j.issn1001-1390.2019.021.013
中文关键词: 海上风电场  风电机组  应急电源  大孤岛  运行模式  配置方案
英文关键词: Offshore  wind farm, wind  turbine, emergency  power supply, big  island, operation  mode, configuration  scheme
基金项目:华能研究资助项目(HNKJ16-H25)
Author NameAffiliationE-mail
Fu Chunxiang* PowerChina Huadong Engineering Corporation,Hangzhou 631787404@qq.com 
Luo Xuanyao School of Electrical Engineering, Wuhan University luo_whu@163.com 
Li Hongke PowerChina Huadong Engineering Corporation,Hangzhou li_hk@edici.com 
Ma Runze School of Electrical Engineering,Wuhan University ma_rz@ecidi.com 
Chen Zhenghua Huaneng Jiangsu Clean Energy Branch Company hnqdfd_czh@163.com 
Chen Baichao School of Electrical Engineering, Wuhan University whgycbc@163.com 
Hits: 1364
Download times: 561
中文摘要:
      随着中国海上风电场的缓慢起步,海上风机需要在孤岛运行情况下配置合适的应急电源以保证可靠性,而海上风电场孤岛运行模式面临着设备配置选择、运行操作方式等诸多问题。因此,本文分析了海上升压站大孤岛运行模式的必要性和适用性,提出了大孤岛运行模式的电气系统设计方案,通过仿真分析验证了配置方案的适用工况。上述成果在二项海上风电场工程中得到了应用,并且可为今后的海上风电场工程建设提供指导。
英文摘要:
      With the slow start of offshore wind farm in China, the reliability of the offshore wind turbines needs emergency power supply with appropriate configuration under island operation mode as a guarantee, while offshore wind power’s island operation mode is facing many problems in equipment configuration selection, operation methods etc.. Therefore, this paper analyzes the necessity and applicability of the big island operation mode of offshore substation, and puts forward the island operation mode of the electrical system design scheme, and verify the applicable conditions of the scheme through simulation and analysis, which has been applied in two offshore wind farm projects and provides some reference to the offshore wind power project construction in the future.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd