• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于数字仿真结果的小电流接地故障模拟测试系统
Simulation Test System for Small Current Grounding Fault Based on Digital Simulation Results
Received:August 27, 2018  Revised:August 27, 2018
DOI:
中文关键词: 数字仿真  单相接地故障  典型配电系统  仿真步长  间歇性电弧接地
英文关键词: digital simulation  single phase grounding fault  typical distribution system  simulation step length  intermittent arc grounding
基金项目:
Author NameAffiliationE-mail
CHU Hongding College of Electrical and Electronic Engineering,Shandong University of Technology 705390827@qq.com 
XU Bingyin* College of Electrical and Electronic Engineering,Shandong University of Technology xuby@vip.163.com 
CHEN Heng College of Electrical and Electronic Engineering,Shandong University of Technology 258425811@qq.com 
WANG Jinghua College of Electrical and Electronic Engineering,Shandong University of Technology wangjh@kehui.cn 
ZHANG Haitai Shandong Kehui Power Automation Co,Ltd zhanght@kehui.cn 
Hits: 1636
Download times: 823
中文摘要:
      针对日益增长的小电流接地故障检测与保护装置的测试需求,研制了基于数字仿真结果的小电流接地故障模拟测试系统。搭建了能够模拟绝大多数单相接地故障场景的典型配电系统;给出了仿真步长的选择方法;利用霍哈赖纳(Hochrainer)模型仿真电弧,对燃弧与熄弧条件进行了改进;在线路上并联一个高阻值电阻,解决ATP-EMTP中Π等效模型无法设置对地电导,使得熄弧后直流电荷无法释放的问题。通过仿真波形和实际故障波形的对比,验证了测试系统的可用性。
英文摘要:
      Aiming at the increasing test requirements for small current ground fault detection and protection devices, a simulation testing system for small current grounding fault based on digital simulation results was developed. Typical distribution systems that could simulate most kinds of the single-phase ground faults were built. The selection method of simulation step size was given. The Hochrainer model was used to simulate arc and the conditions of arc burning and extinguishing were improved. A high resistance earth resistance was connected to each phase to solve the problem that the Π-type equivalent model in ATP-EMTP could not simulate the ground conductance, so that the DC charge could be released after arc extinguishing. The availability of the test system was verified by comparing the simulated waveforms with the actual fault waveforms.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd