• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
考虑风电不确定性的蓄热式电采暖消纳弃风经济性分析
Day-ahead Economic Analysis of Electric Heating with Storage System for Heating Considering the Uncertainty of Wind Power
Received:January 02, 2019  Revised:January 02, 2019
DOI:10.19753/j.issn1001-1390.2020.13.009
中文关键词: 风电预测误差  供给价格弹性  热负荷  储热装置  弃风
英文关键词: wind power prediction error  price elasticity of supply  thermal load  storage device for heating  wind power curtailment
基金项目:2017国家电网公司总部科技项目(2017GW-20)。
Author NameAffiliationE-mail
Yang Yulong School of Electrical Engineering,Northeast Dianli University yougyokuryuu@hotmail.com 
Wang Zishan* School of Electrical Engineering,Northeast Dianli University 1548411183@qq.com 
Yang Zhen School of Electrical Engineering,Northeast Dianli University 1678084931@qq.com 
Liang Junfeng The secondary overhaul room of substation in Jilin Power supply Company of State Grid 1552351357@qq.com 
Hits: 1987
Download times: 483
中文摘要:
      针对冬季采暖期我国北方地区严重弃风和燃煤导致的空气污染问题,综合考虑风电预测误差及供给价格弹性,以采暖期系统运行成本最小为优化目标,构建基于终端热负荷特性的电锅炉日前优化调度模型,并在电力市场背景下分析了蓄热式电采暖供暖系统的运行经济性。通过引入储热装置来更加合理的利用各时段弃风电量,从而进一步提高供热系统运行经济性。在求解阶段,采用CPLEX软件包下的分支定界法(BBA)对模型求解,并通过具体算例仿真结果验证了所提方法的有效性。
英文摘要:
      In order to solve these issues that severe abandonment of wind and air pollution caused by coal combustion in North China during winter heating period, considering the forecast error of wind power and price elasticity of supply, a electric boiler pre-day optimal scheduling model based on terminal heat load characteristics is constructed by taking the minimum operation cost of the heating system as the optimization objective function and the operation economy of electric heating system with storage system for heating is analyzed under the background of electricity market. Through the introduction of heat storage device to make more reasonable use of the wind power curtailment in all periods, the operation economy of the heating system is further improved. In solving stage, branch and bound algorithm (BBA) based on CPLEX software is used to solve the model, and the effectiveness of the proposed method and model is verified by the simulation results of a certain example.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd