• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
地沉降工况下杆塔应变实时监测与失效预警技术研究*
Tower strain real-time monitoring and failure warning technology research under land subsidence condition
Received:July 05, 2019  Revised:July 23, 2019
DOI:10.19753/j.issn1001-1390.2019.020.002
中文关键词: 有限元  塔-线系统  地基沉降  应变监测  失效预警
英文关键词: FEM, tower-line  system, land subsidence, strain monitoring, failure warning
基金项目:国家电网公司华中分部科技项目(SGHZ0000AJQT1800181)
Author NameAffiliationE-mail
GAN Yan Central China Branch of State Grid Corporation gany@cc.sgcc.com.cn 
ZHOU Wenfeng School of Electrical Engineering and Automation,Wuhan University 790406105@qq.com 
DU Zhiye* School of Electrical Engineering and Automation,Wuhan University 2435321@qq.com 
ZOU Jianming Central China Branch of State Grid Corporation zoujm@cc.sgcc.com.cn 
ZHANG Li School of Electrical Engineering and Automation,Wuhan University 756970523@qq.com 
Hits: 1804
Download times: 629
中文摘要:
      地壳运动、地沉降等因素会引起杆塔地基发生变化,严重影响输电线路运行的安全性。本文以地基沉降下某500 kV危塔为研究对象,建立精细塔-线系统有限元模型,通过仿真模拟实际地基沉降工况下杆塔应力分布情况,确定沉降杆塔上的薄弱构件并安装应变监测系统。结合多种工况下有限元仿真结果,验证了仿真结果的可靠性,获得杆塔临界失效情况下对应的测点应变变化裕度,根据系统实时监测结果对杆塔失效进行预警。结合工程实际应用,对判断地基沉降工况下杆塔的稳定性具有一定的指导作用。
英文摘要:
      Factors such as crustal movement and land subsidence will cause changes in the tower foundation, which seriously affect the safety of transmission line operation. Taking a 500kV dangerous tower as an example, this article establishes a precise tower-line system which based on finite element method. By simulating the stress distribution of the tower in actual foundation settlement, it can determine the weak components of the settlement tower, and install the strain monitoring system. Combined with the finite element simulation results in various conditions, the reliability of simulation results is verified, and the range of strain variation of the corresponding measuring point is obtained. Then the failure of the tower can be predicted in real time according to the system monitoring results. Combined with the actual engineering application, it has a certain guiding role in judging the stability of the tower under the foundation settlement condition.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd