• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于双芯架构的停上电主动上报电能表设计
Initiative Power Outage and Power On Event Reporting Smart Meter Design based on Dual Core Architecture
Received:August 09, 2019  Revised:August 09, 2019
DOI:10.19753/j.issn1001-1390.2021.03.029
中文关键词: 智能电能表  停上电主动上报  超级电容  蓝牙  泛在电力物联网
英文关键词: smart meter, initiative power outage and power on reporting, super capacitor, Bluetooth, ubiquitous power IoT
基金项目:国家电网有限公司科技项目(521101180017)
Author NameAffiliationE-mail
Lu Chunguang Zhejiang Electric Power Corporation Research Institute zjdl_lcg@163.com 
Han Xiaohan Zhejiang Electric Power Corporation Research Institute han_xiaohan_jl@zj.sgcc.com.cn 
Xu Tao* Zhejiang Electric Power Corporation Research Institute 434772150@qq.com 
Li Xiong Zhejiang Electric Power Corporation Research Institute li_xiong@zj.sgcc.com.cn 
Wang Weifeng Zhejiang Electric Power Corporation wang_weifeng@zj.sgcc.com.cn 
Ye Fangbin Zhejiang Electric Power Corporation Research Institute yefangbin@zj.sgcc.com.cn 
Hits: 2219
Download times: 528
中文摘要:
      本文提出一种基于双芯架构支持停上电主动上报的智能电能表技术方法,选择超级电容作为后备电源为MCU、通信模块等供电,研究设计主动上报流程。在II型集中器采集模式下,提出配置蓝牙通信模块实现电能表停上电信息的主动上报。经测试验证,在不同采集模式下均能满足电能表停上电信息主动、快速、准确上报的需求,在泛在电力物联网的建设过程中具有极大的应用价值。
英文摘要:
      This paper proposed a dual core smart meter design for initiative power outage and power on event reporting. The design adopted the idea of dual core, Bluetooth communication module was deployed under type II concentrator acquisition mode. Meanwhile, a super capacitor was added in management core, which supplied power for management core MCU、communication module. The super capacitor ensured the reliability of power outage and power on reporting. Based on the design proposed in this paper, a smart meter is developed and tested. Under different acquisition modes, it can meet the time and accuracy requirements of initiative power outage and power on event reporting. The design shows high practical value under circumstance of ubiquitous power IoT.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd