• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于改进混合法的电网运行可靠性评估方法研究
Research on Reliability Assessment Method of Power Grid Operation Based on Improved Hybrid Method
Received:October 08, 2019  Revised:October 08, 2019
DOI:10.19753/j.issn1001-1390.2021.10.011
中文关键词: 电力系统  运行可靠性评估  混合法  电网连锁故障  多属性决策
英文关键词: power  system, operation  reliability assessment, Hybrid  Method, grid  cascading failure, multi-attribute  decision
基金项目:贵州省科学技术基金(黔科合基础[2019]1058); 贵州省科学技术基金(黔科合基础[2019]1128)
Author NameAffiliationE-mail
Li Li Electric Power Research Instituteof Guizhou Power Grid Co,Ltd 997645530@qq.com 
Yang Dongsheng Electric Power Research Instituteof Guizhou Power Grid Co,Ltd 110862963@qq.com 
Yu Mengtian College of Electrical Engineering, Guizhou University 2052814119@qq.com 
Li Zhuo College of Electrical Engineering, Guizhou University 254689213@qq.com 
Xiong Wei* College of Electrical Engineering, Guizhou University 420034562@qq.com 
Huang Youjin College of Electrical Engineering, Guizhou University 511905681@qq.com 
Hits: 1365
Download times: 369
中文摘要:
      针对电网运行可靠性评估中难以计及系统的高阶故障状态影响、使用传统可靠性评估方法已经不能满足运行可靠性指标的计算时间要求等问题,提出一种解析法与蒙特卡洛法相结合的改进混合法,其基本思想是:首先利用解析法处理系统的N-1阶故障,计算初始可靠性指标;然后对于系统的高阶故障以预想事故链替代,采用蒙特卡洛法抽样出连锁故障的初始环节,再进行中间环节的判断识别,并计算中间可靠性指标;最后累计计算系统的可靠性指标,实现系统的运行可靠性评估。通过对RTS-79算例和贵州某地区电网为例分析,并与传统的蒙特卡洛法对比系统是否考虑连锁故障的可靠性指标计算效果,验证了本文所提方法的正确性与有效性。
英文摘要:
      In view of the problem that the high-order fault state of the system is difficult to be considered in the reliability assessment of the grid operation, and the traditional reliability assessment method can not meet the calculation time requirements of the operational reliability index, an analytical method combined with the Monte Carlo method is proposed. The basic idea of the improved hybrid method is: firstly, the N-1 fault of the system is processed by the analytical method, and the initial reliability index is calculated; then, the high-order fault of the system is replaced by the expected accident chain, and the Monte Carlo method is used to sample the cascading fault. In the initial step, the intermediate link is judged and identified, and the intermediate reliability index is calculated. Finally, the reliability index of the system is calculated and the system operation reliability evaluation is realized. Through the analysis of RTS-79 system and a power grid in Guizhou Province, and comparing with the traditional Monte Carlo method, the correctness and validity of the proposed method are verified.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd