• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于BIM-5D技术的特高压换流站工程管控系统
Project control system of UHV converter station based on BIM-5D technology
Received:August 11, 2020  Revised:August 24, 2020
DOI:10.19753/j.issn1001-1390.2020.24.016
中文关键词: 特高压换流站  工程管控  BIM-5D  预警模型  最小二乘法  挣得值法
英文关键词: UHV  converter station, engineering  controlling, BIM-5D, forewarning  model, least  square method, earned  value method
基金项目:基金项目:国网科技项目(J2018063)
Author NameAffiliationE-mail
Zhang AIfeng* Chongqing Electric Power Trading Center Co,Ltd Chongqing hmtwhcy999@163.com 
Peng Dong Sichuan Power Electric Corporation Si Chuan Cheng Du hmtwhcy999@163.com 
Xiang Fangyu Guiyang Bureau of China Southern Power Grid Co,Ltd GuiZhou,GuiYang hmtwhcy999@163.com 
Hits: 1076
Download times: 441
中文摘要:
      提出了一种基于BIM-5D技术的特高压换流站工程管控能力提升方法,在BIM-5D系统整体框架上,利用多次自适应最小二乘曲线拟合和分段预警方法建立了施工进度和成本管控预警模型。采用挣得值法对预警模型进行了参数校正和预警阈值范围设置,获取最终的特高压换流站工程管控系统。结合具体案例对特高压换流站工程的施工进度和成本进行分析,并得到了相应的应用场景。案例分析结果表明,基于BIM-5D技术的特高压换流站工程管控系统,能够有效对施工进度和成本进行管控。
英文摘要:
      An UHV converter station engineering controlling capability improvement method based on BIM-5D technology is proposed. On the overall framework of BIM-5D system, construction schedule and cost management control early warning model are established by using multiple adaptive least square curve fitting and segmented warning methods. The earned value method was used to correct the parameters of the early warning model and set the warning threshold range, and the final UHV converter station engineering control system was obtained. The construction schedule and cost management of UHV converter station project are analyzed with specific cases, and the corresponding application scenarios are obtained. The case analysis results show that the engineering controlling system of UHV converter station based on BIM-5D technology can effectively control the construction schedule and cost management.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd