• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
单相智能电能表现场检测与寿命评估
On-site inspection and life evaluation of single-phase intelligent electric energy meter
Received:August 14, 2020  Revised:September 03, 2020
DOI:10.19753/j.issn1001-1390.2020.04.007
中文关键词: 单相智能电能表现场检测  单相智能电能表延寿  安装式标准电能表  
英文关键词: on-site detection of single-phase intelligent watt hour meter  life extension of single-phase intelligent watt hourmeter  field mounted standard watt hour meter
基金项目:
Author NameAffiliationE-mail
Yang Fu Li* Marketing service center of State Grid Chongqing Electric Power Company 1315983633@qq.com 
Zheng Ke Marketing service center of State Grid Chongqing Electric Power Company 1315983633@qq.com 
Zhou Bo Marketing service center of State Grid Chongqing Electric Power Company 1315983633@qq.com 
Zhang Bing Marketing service center of State Grid Chongqing Electric Power Company 1315983633@qq.com 
Zhou TanJie Marketing service center of State Grid Chongqing Electric Power Company 1315983633@qq.com 
Hits: 1446
Download times: 441
中文摘要:
      文章针对现场使用中已经达到设计使用寿命的单相智能电能表,选取使用环境不同的多个现场网点。采用现场校验仪、现场检定装置、精密稳定电源等设备,对运行中的单相智能电能表进行现场误差检测、现场日计时检测、现场电量比对等测试。然后将单相智能电能表拆回实验室在参比条件下通过电能表检定装置进行检测。将两种测试数据和单相智能电能表挂网前的测试数据进行比对,来分析单相智能表在达到设计使用寿命后各项功能的衰减情况,评估单相智能电能表继续延寿运行的可靠性。
英文摘要:
      For single-phase intelligentwatt hour meters which have reached the designed service life and choise severaltypical environments,usethe on-site calibrator, on-site verification device, precision and stable power supplier and other equipments to measure on-site error detection, on-site daily time detection, on-site power comparison and other tests on the in used single-phase smart energy meter. Then, the single-phase intelligent watt hour metersarebe taken back to the laboratory and tested by the electric watt hour meter verification device under the reference condition. Compare the two kinds of test data with the test data before the single-phase intelligent watt hour metersare connected to the network to analyze the attenuation of various functions of the single-phase intelligent watt hour meter after reaching the design life, and evaluate the single-phase intelligent watt hour meter"s continued life extension reliability.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd