• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于分段迭代法的PMU的优化配置研究
Research on optimal PMU allocation based on section iterative method
Received:March 27, 2015  Revised:April 09, 2015
DOI:
中文关键词: PMU  迭代算法  IEEE节点系统  优化配置  可观性
英文关键词: PMU  iterative algorithm  IEEE bus system  optimal allocation  observability
基金项目:天津市科技支撑计划项目(13ZCZDGX03800,
Author NameAffiliationE-mail
Zhao Hui Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin 978105513@qq.com 
ZHAO Shaohua* Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin 978105513@qq.com 
WANG Hongjun Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin  
YUE Youjun Tianjin Key Laboratory for Control Theory and Application in Complicated System Tianjin University of Technology,Tianjin  
Hits: 2260
Download times: 630
中文摘要:
      对电力系统中有限个数目PMU的优化配置进行研究。采用分段迭代法对PMU的优化配置进行研究。该法假设最初每个节点均安装有PMU。第一阶段和第二阶段的迭代算法用来去除那些不太重要的节点的PMU配置,并保留节点位置重要的PMU的配置。第三阶段的迭代算法则对前两阶段的PMU数目进行进一步的最小化,并且充分考虑电力系统全网的可观性,使得该法达到PMU的最优配置。通过在IEEE 14和IEEE 30节点上进行仿真验证,并与现有的优先算法在计算时间上进行对比,证明该法在计算时间上的优越性,及该法的有效性。
英文摘要:
      Research on the optimal allocation of a limited number of PMU in power system device.A three Stage method will be adopted to study he optimal allocation of PMU. The method assumes that each bus is installed with PMU initially. The first stage and the second stage of iterative algorithmis used to remove those less important buses of the PMU configuration, and keep the important position of the buses PMU configuration. The three stage of iterative algorithm make a further minimize of the first stage and the second stage, and considering the observability of power system, to ensure the optimal configuration of PMU. According to simulation on IEEE 14 bus and IEEE 30 bus system, and compared with the existing priority algorithm in computation time, Results show that the proposed method have advantages in computation time , and the validity of this method.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd