• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
限制短路电流水平的220kV电网规划方法
220kV Network Expansion Planning Considering Short-Circuit Current Constraint
Received:September 12, 2017  Revised:September 12, 2017
DOI:
中文关键词: 220kV电网规划  短路电流  电磁环网  N-1校验
英文关键词: 220kV network expansion planning, reduction of short-circuits current, electromagnetic coupled power loop, N-1 verification
基金项目:国家重点研发计划资助项目 (2016YFB0900102);国家电网公司科技项目(5211JY160004)
Author NameAffiliationE-mail
Fang Buxun* Shanghai Jiao Tong University buxun_fang@163.com 
Cheng Haozhong Shanghai Jiaotong University hzcheng@sjtu.edu.cn 
Xu Qian State Power Economic Research Institute qian_xu@163.com 
Hits: 1811
Download times: 554
中文摘要:
      随着系统装机容量和负荷的不断增长,220kV电网所面临的短路电流越限问题日益凸显。从网架结构规划上限制系统短路电流水平,既要考虑与上级500kV相配合,避免电磁环网,分区分片运行;又要考虑对下级系统的供电可靠性,能够满足N-1原则。本文以系统阻抗矩阵出发,计及故障限流器及断路器遮断容量的优化配置,提出了考虑短路电流约束的双层网架规划模型及其相应求解方法,随后以华东某地区实际网架作为算例进行了2030年的网架规划,验证了所提出规划方法的可行性。
英文摘要:
      220kV network is confronted with problems such as violation of short-circuit current constraints brought by increasing installed generation capability and system load. For restricting the value of short-circuit current of power system, 220kV network need to cooperate with 500kV network in order to avoid electromagnetic coupled power loop thus be operated in voltage-grading and district-dividing topology. Meanwhile, 220kV network is supposed to meet reliability restrictions based on N-1 principles to further ensure the responsibility as energy supplying system. Aiming at the limitation of short-circuit current, this paper proposes a bilayer model of 220kV network expansion planning with its corresponding solution algorithm considering the optimization of current limiting methods. An actual study case of expansion planning in year 2030 generated from eastern China power system is used to prove the feasibility of the mentioned methodology.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd