• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于分布式光纤的电网台风灾害预警方法研究
Research on Warning Method of Typhoon Disaster Based on Distributed Fiber
Received:December 07, 2017  Revised:December 07, 2017
DOI:
中文关键词: 台风  风荷载  分布式光纤  损耗  预警
英文关键词: typhoon  wind load  distributed fiber  loss  warning
基金项目:
Author NameAffiliationE-mail
tanlei State?Grid?Beijing?Electric?Power?Company 340689241@qq.com 
zhaoyongqiang State?Grid?Beijing?Electric?Power?Company 340689241@qq.com 
zhaoliuxue State?Grid?Beijing?Electric?Power?Company 340689241@qq.com 
zhoukai Electric?Power?Research?Institute?of?State?Grid?Beijing?Electric?Power?Company 340689241@qq.com 
wangrong* Wuhan KPCQ Software Technology CO.,LTD 340689241@qq.com 
Hits: 1724
Download times: 615
中文摘要:
      台风引发输电线路不同程度的运行故障,其根本原因在于风荷载的影响。因此为了保证电网的安全稳定运行,本文基于分布式光纤测风技术提出了一种电网台风灾害实时预警方法。通过分布式监测设备得到的风速计算出实时风荷载,综合考虑线路在大风持续下带来的损耗不一、自身运行状态、运维遗留问题等三方面因素,动态修正设计风荷载,并与实时风荷载建立相应判据,发布对应的预警信息以及损耗排序,指导电网人员首选大风险或潜在风险档距进行巡检,避免盲目的同时大大减少工作量,将台风灾害损失降到最低。
英文摘要:
      Typhoon caused varying degrees of operational failure of transmission lines, the fundamental reason is the impact of wind load. Therefore, in order to ensure the safe and stable operation of the power grid, this paper propose a typhoon disaster early warning method based on distributed fiber wind technology. Firstly, the wind load is calculated through the real-time wind obtained by the distributed monitoring equipment. And then considering comprehensively the different losses from the duration of the wind, the self-running status and the problems left over from the operation and maintenance of the line, the dynamic correction of design wind load is completed. Then after comparing the real-time wind load with design wind load corrected dynamically, the corresponding warning level of typhoon disaster can be released. Finally, the order of loss caused by typhoon can guide the staff preferred large risk or potential risk spans for inspection, which can avoid blindness while lightening the workload considerably and minimize the typhoon disaster loss.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd