In order to solve the problems of the power end fusion system, a study based on edge calculation was proposed. This optimization scheme uses edges to calculate the advantages of optimal scheduling and management of network resources. Integrate calculations, decompression, and application cores into the original system model,and improve the network topology and calculation and analysis mechanisms. The system can improve the edge device data transfer efficiency, data migration and storage functions, and localize the fault. In addition, it also improves redundancy. The program can meet the requirements of real-time data transmission and redundancy in the current power system integration process.