• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
电池储能系统参与电网削峰填谷实用算法
Practical algorithm applied in peak load shifting of battery energy storage system in power grid
Received:July 27, 2018  Revised:August 20, 2018
DOI:
中文关键词: 电池储能系统  削峰填谷  优化模型  实用算法
英文关键词: battery  energy storage  system, peak  load shifting, optimization  model, practical  algorithm
基金项目:
Author NameAffiliationE-mail
Dong Huifeng State Grid Henan Energy Service Co Ltd 13838387123@163.com 
Niu Wendi School of Electrical Engineering and Automation, Harbin Institute of Technology 1920294219@qq.com 
Yang Xuqiang* School of Electrical Engineering and Automation, Harbin Institute of Technology hitlaoyang@hit.edu.cn 
Guo Zhimin Henan Epri Hitech group Co. Ltd. gzm514@163.com 
Zhou Li State Grid Henan Energy Service Co Ltd 13607670486@126.com 
Hits: 1623
Download times: 735
中文摘要:
      为使电池储能系统简单有效参与电网削峰填谷,提出一种电池储能系统参与电网削峰填谷功率优化模型以及电池储能系统参与电网削峰填谷实用算法。该算法充分考虑电池储能系统实际约束,并能实用方便的规划电池储能系统充放电时间段及充放电功率。通过实例分析,该算法简单、实用、可行。
英文摘要:
      In order to apply the battery energy storage system in the peak load shifting in power grid effectively, the power optimization model in peak load shifting of the battery energy storage system is put forward in this paper as well as the practical algorithm solving the model. The practical constraints of the battery energy storage system are fully considered in this practical algorithm. Through this practical algorithm, the charging and discharging periods and power of the battery energy storage system can be effectively planned. Through an example analysis, the algorithm is simple, practical and feasible.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd