• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
计及二级仓库临时缓存的智能电表检定工作安排优化方法
An Optimization Method for Smart Meters’ Verification Arrangement Considering Temporary Cache of Secondary Warehouses
Received:August 28, 2018  Revised:September 26, 2018
DOI:10.19753/j.issn1001-1390.2019.020.024
中文关键词: 智能电表  检定工作安排  二级仓库  供需关系  优化  序列二次规划法
英文关键词: smart meter, verification arrangement  secondary warehouse  supply and demand relationship  optimization  sequential quadratic programming
基金项目:国家重点研发计划大科学装置前沿研究专项课题(2016YFA0401703)
Author NameAffiliationE-mail
Cai Wenjia Metrology Center,Hubei Electric Power Company Limited,State Grid 406381119@qq.com 
Li Hongbin School of Electrical and Electronic Engineering of Huazhong University of Science and Technology 1485325109@qq.com 
Tang Dengping Metrology Center,Hubei Electric Power Company Limited,State Grid 2636178594@qq.com 
Jiao Yang* School of Electrical and Electronic Engineering of Huazhong University of Science and Technology yyangjiao@hust.edu.cn 
Tuo Jing Metrology Center,Hubei Electric Power Company Limited,State Grid 406381119@qq.com 
Liu Cencen Metrology Center,Hubei Electric Power Company Limited,State Grid 406381119@qq.com 
Hits: 1563
Download times: 535
中文摘要:
      目前,在制定智能电表检定工作计划时,主要关注月度供应量、需求量的对等关系,易造成检定工作量在不同月份的严重不平衡,为检定工作开展、人员安排带来障碍。对此,本文提出了一种计及二级仓库临时缓存的智能电表检定工作优化安排方法,设置总体目标为平衡不同月份智能电表检定工作量,结合供应量、需求量、库存量三者之间的关系,建立优化问题的目标函数和约束条件;并借助序列二次规划法进行问题求解,获得一个可使月检定工作量足够均衡的工作安排;最后,应用本文方法,对湖北省计量中心2017年度的智能电表检定工作进行优化安排,验证其有效性。
英文摘要:
      When the plan for smart meters’ verification is made, the attention is mainly paid to the equality between monthly supply and demand, which likely cause serious imbalance in the verification workload of different months and brings obstacles to the verification work and personnel arrangement. To address this issue, an optimization method for smart meters’ verification arrangement is proposed in this paper with temporary storage of smart meters in the secondary warehouses taken in to account. With balancing the verification workload in different months set as the overall goal, the objective function and constraints for the optimization problem are established based on the relationships between the supply quantity, demand quantity and inventory quantity. Then Sequential Quadratic Programming is used to solve this problem and a arrangement with monthly verification workload balanced is obtained. Finally, the proposed method is adopted to optimize the verification plan, verifying its validity.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd