• HOME
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • Chinese
Site search        
文章摘要
基于分布鲁棒机会约束的机组组合模型
Unit commitment with distributionally robust chance constraints
Received:October 31, 2019  Revised:October 31, 2019
DOI:10.19753/j.issn.1001-1390.2021.01.005
中文关键词: 分布鲁棒  机会约束  双边模型  单峰性  保守性
英文关键词: distributionally robust, chance constraint, two-sided model, unimodality, conservativeness
基金项目:国家重点研究项目(2018YFC1505502-03);四川省科技厅资助项目(2018GZ0394);成都市科技局(2017-RKOO-0029-ZF)
Author NameAffiliationE-mail
Liu Ming Sichuan University 1715736898@qq.com 
Zeng Chenbi* Sichuan University zengchengbi@scu.edu.cn 
111 1111 1111@qq.com 
Hits: 1389
Download times: 452
中文摘要:
      可再生能源的大量渗透使得传统的机组组合的解决方法不可行,文中主要对含有不确定变量约束的机组组合模型进行研究。首先将含不确定变量的功率平衡约束松弛为不等式约束,并将该不等式约束与旋转备用约束以及传输极限约束均转化为基于矩信息模糊集的分布鲁棒机会约束模型,采用双边模型处理传输极限约束以提高可靠性;为了使模型便于求解,双边模型采用Bonferroni近似,再通过线性化手段将分布鲁棒机会约束机组组合模型转化为混合整数线性规划模型;且以假定模糊集中的分布函数具有单峰性的方式降低模型的保守性;最后,应用六机系统的算例验证了所建模型的有效性。
英文摘要:
      The massive penetration of renewable energy makes the solution of traditional unit commitment infeasible. The paper mainly studied the model with uncertain variable constraints. Firstly, the power balance constraint with uncertain variables is relaxed into an inequality constraint, and the inequality constraint, the reserve constraint and the transmission line constraint are transformed into a distributionally robust chance constraint model with ambiguity set based on the moment information and the two-sided model is used to deal with the transmission line constraints to improve reliability. In order to make the model traceable, the Bonferroni approximation is used to approximate the two-sided model and the unit commitment model is transformed into a mixed integer linear programming problem by linearization method. The conservativeness of the model is reduced by assuming that the distribution function in the ambiguity set is unimodal. Finally, case analysis of six-bus system and numerical results verified the validity of the proposed model.
View Full Text   View/Add Comment  Download reader
Close
  • Home
  • About Journal
    • Historical evolution
    • Journal Honors
  • Editorial Board
    • Members of Committee
    • Director of the Committee
    • President and Editor in chief
  • Submission Guide
    • Instructions for Authors
    • Manuscript Processing Flow
    • Model Text
    • Procedures for Submission
  • Academic Influence
  • Open Access
  • Ethics&Policies
    • Publication Ethics Statement
    • Peer Review Process
    • Academic Misconduct Identification and Treatment
    • Advertising and Marketing
    • Correction and Retraction
    • Conflict of Interest
    • Authorship & Copyright
  • Contact Us
  • 中文页面
Address: No.2000, Chuangxin Road, Songbei District, Harbin, China    Zip code: 150028
E-mail: dcyb@vip.163.com    Telephone: 0451-86611021
© 2012 Electrical Measurement & Instrumentation
黑ICP备11006624号-1
Support:Beijing Qinyun Technology Development Co., Ltd